Skip to content
Corridor of a multifamily building during fit-out, with identical unit doorways and cabinet boxes set in an unfinished kitchen

02 / MULTIFAMILY & DEVELOPER

Volume changes the problem.

Installing one kitchen well is a trade skill. Installing them across a building on a lease-up schedule is a logistics problem wearing a trade skill as a hat. That second problem is the one we are organized around.

PROJECT TYPES

Four shapes of work.

New construction lease-up

Phased by building and by floor against your programme, sequenced with the trades immediately ahead of and behind us so a slip in one does not silently become a slip in ours.

Unit turns

Scoped per unit and scheduled around occupancy and make-ready dates. Turn deadlines are treated as fixed, because for you they are.

Community-wide renovation

Rolling scope across occupied buildings, with resident notice, daily protection and a predictable footprint so the property keeps operating around us.

Common areas & amenity

Millwork, storage and finish carpentry in leasing offices, clubrooms, mail rooms and amenity spaces — usually on a shorter fuse than the units.

Installed kitchen with cabinet runs and appliance surrounds
Installed kitchen cabinets with upper and base runs and a tile backsplash
Installed kitchen cabinetry with a tall pantry run and wall oven surround
Wrapped cabinet material stacked on pallets across an unfinished floor of a building under construction

THE VOLUME MODEL

What actually determines whether a phase lands on time.

Almost never the installation itself. These are the four things that decide it.

Phasing and stacked-unit sequencing
We work stacks rather than scattering crews across a building, so material moves once and finished units stop being circulation routes.
Material staging
Delivery timed to the phase rather than the order, staged where it does not block another trade, and stored so damage does not appear at closeout.
Elevator and access coordination
Hoist and elevator windows booked in advance. On a mid-rise this is the constraint that quietly sets everyone else’s schedule.
Trade coordination
We tell you when we are ready and when we are blocked. A subcontractor who reports a problem late has turned their problem into yours.

What a unit looks like while we are in it

Material staged clear of other trades, floors protected, and a run set before the surface trades follow.

Cabinet work in progress in an unfinished unit with floors protected
Cabinet material staged in an unfinished unit before installation
Cabinet run set and levelled during installation

OCCUPIED COMMUNITIES

Working around residents.

A renovation in an occupied building is judged by the people living through it, not only by the owner paying for it.

  • Resident notice before work starts in a unit
  • Floor and surface protection laid daily, not once
  • Work hours agreed with property management and kept
  • Common routes left clear and clean at the end of every shift
  • Material secured overnight rather than left in corridors
  • One point of contact for property staff throughout

PER-UNIT CLOSEOUT

Every unit closes the same way.

At volume, closeout is where a job either finishes or drags. Ours is the same procedure on unit one and unit two hundred.

  1. Self-walk

    We walk our own work and fix what we find before anyone else sees it.

  2. Photo record

    Completed unit photographed to a consistent standard and filed by unit number.

  3. Punch

    Outstanding items listed with a date, resolved before your walkthrough rather than during it.

  4. Sign-off

    Written handover stating what is complete and what, if anything, is not.

Installed closet system with a drawer bank and shelf tower
Installed closet system with adjustable shelving and hanging sections
Installed closet system with a drawer bank and shelf tower
Installed kitchen cabinet run with hardware fitted

Ask us what we can hold this quarter.

We do not publish capacity, because it changes. Tell us the unit count and the dates and we will tell you honestly whether we can take it.