Skip to content
Wide view down a data center aisle with many rows of server racks and overhead cable trays

AUSTIN & CENTRAL TEXAS

Data-center installation, self-performed.

Structured cabling, rack and cabinet installation, and testing and certification for general contractors, EPCs and data-center owner-operators. Scheduled to the phase, sequenced around other trades, and documented at closeout.

  • Insured
  • OSHA 30 certified
  • EPA RRP lead certified
  • 10+ years construction experience

WHAT WE INSTALL

Three trades, self-performed.

A self-performing specialty installation contractor focused on structured cabling, rack and cabinet installation, and testing and certification. These are the trades our crews do themselves, which is why the schedule and the punch list are answerable to one company.

Structured Cabling & Pathways

Copper and fiber pulled and dressed across full pathway runs, with the labeling and termination work that decides whether a cable plant reads as installed or as tangled.

  • Copper (Cat6/Cat6A) and fiber cable pulling
  • Cable tray, basket tray and pathway support install
  • Termination, patch panel dressing and labeling
  • Firestop and pathway penetration coordination
Structured cabling scope of work

Rack, Cabinet & Equipment Installation

Rack and cabinet set, power and cable management, and the levelling work that turns a floor plan into equipment a technician can actually service.

  • Rack and cabinet set, levelling and anchoring
  • Equipment mounting and in-rack cable management
  • Power whip and PDU coordination
  • Hot/cold aisle containment install
Rack and cabinet scope of work

Testing, Certification & Documentation

Certification testing and as-built documentation — the deliverable that gets inspected first because it is the only proof of what is actually behind the wall.

  • Copper and fiber certification testing
  • Labeling verification and as-built records
  • Punch-list resolution and remediation
  • Documentation deliverables at closeout
Testing and certification scope of work
Overhead cable basket tray and red conduit pipes on an exposed concrete ceiling

DATA CENTERS

Scale changes the problem.

Pulling one cable run is a trade skill. Pulling, labeling and terminating thousands of them against a commissioning date is a logistics problem wearing a trade skill as a hat — pathway coordination, other trades working the same space on the same day, and documentation that has to be right the first time because it is the only record of what is behind the wall.

That is the work we are built around: phased delivery against a commissioning schedule, per-engagement closeout, and a punch process that resolves before testing rather than during it.

  • New build-out

    Phased against the commissioning schedule, sequenced against the trades ahead of and behind us.

  • Retrofit & MACs

    Scoped per engagement and scheduled around live infrastructure, with change windows treated as fixed.

  • Testing & certification

    Copper and fiber certification, labeling verification and as-built documentation.

  • Rack & cabinet installation

    Set, levelling, power and cable management inside the rack, not just around it.

HOW WE WORK

Four stages, and the last one is the one people remember.

Most installation problems are not installation problems. They are scheduling, staging or handover problems that surface as installation problems.

  1. Scope & measure

    Field verification against the drawings before anything is ordered, with discrepancies raised while they are still cheap.

  2. Schedule & sequence

    Phasing agreed against your programme, staging planned around access, and coordination with the trades either side of us.

  3. Install & protect

    Finished surfaces protected daily. Material staged where it does not block another crew. Site left clean at the end of every shift.

  4. Punch & close

    Per-unit photo record, punch resolved before walkthrough, and a documented handover rather than a verbal one.

WHO WE WORK WITH

Two buyers, two different questions.

General contractors & EPCs

Can they hold the schedule?

You are buying predictable sequencing against a commissioning date, and a subcontractor who tells you about a slip before it becomes yours.

Data-center work

Data-center owner-operators

Who is accountable?

One company for the cabling, the rack installation and the certification, so a defect at the intersection of all three does not become a conversation about whose it is.

What we install

CLOSEOUT DOCUMENTATION

What you get when we finish.

A new company cannot show you a decade of projects. It can show you exactly what lands in your hands at the end of an engagement — which is the part that survives after the crew leaves.

Certification & as-built record
Every run tested and documented to a consistent standard, filed by location, delivered as a set rather than on request.
Punch resolved before walkthrough
We walk our own work first and fix what we find, so your walkthrough is a verification and not a discovery.
Written handover
Scope completed, hardware and finishes installed, and anything outstanding stated in writing with a date against it.
Damage & claims process
A stated route for anything we damage, so the answer is procedural rather than a negotiation on the day.
Data center aisle with server racks, overhead cable tray, and a mobile workstation cart

COVERAGE

Austin and the Central Texas corridor.

Named towns rather than a radius, so you can tell at a glance whether your site qualifies. If you are just outside this list, ask — it depends on the size of the programme.

  • Austin
  • Round Rock
  • Cedar Park
  • Leander
  • Georgetown
  • Pflugerville
  • Hutto
  • Kyle
  • Buda
  • San Marcos
  • Dripping Springs
  • Lakeway
  • Manor
  • Bastrop
Technician's hands connecting ethernet cables to a network switch in a rack

Send us a scope and we will tell you what we can hold.

Drawings, a rack or cabinet count and a target date are enough to start. We will come back with what is realistic rather than what wins the bid.